The
Customers challenge was to install a system of underground
ducts and chambers on a sensitive site with limited access
and operating times. An adaptable mould was developed to manufacture
various configurations of product which were as light as possible
and easy to install. Several hundred of these units were manufactured
and production is ongoing
|